TOP CIVIL ENGINEER INTERVIEW QUESTION




  1. Why is 1.54 considered in concrete Quantity calculation?


  1. Difference between Centering and Shuttering


  1. Which part of the foundation will distribute the load to the soil?


  1. What is the Minimum dia of the bar that should be used in columns?


  1. What is the size of non modular brick?


  1. Why is the crank provided in slab reinforcement?


  1. Draw the SFD and BMD for any Beams?


  1. What is a SUPERPLASTICIZER?


  1. Calculate the Brickwork for some volume or BBS


  1. What is the Interview Room Size?


  1. What is the minimum no of bar that should be provided in the column?


  1. Name of IS 456-2000

     

     

     

    THIS TOPIC IS DEDICATED TO MY FRIEND Er.R.PAGALAVAN, ALWAYS IN OUR MEMORIES.

     


     




Comments

Popular posts from this blog

Why Cranks Provided in Slab Reinforcement Bars?

  Why Cranks Provided in Slab Reinforcement Bars?     In Construction field most of the rising question is why cranks are provided in slab rebar?Lets go to the Strength of Material subject, we have studied about the Types of supported Cantilever support, Simply support, Continuous support, fixed support , Propped cantilever support and overhanging support.  While design time engineers will be considered beam and slab are fixed support . In fixed support two types of bending moments will be occurred Positive bending moment and negative bending moment. Positive bending moment will occur at center and negative bending moment will occur at supports, to counter the Negative bending moment cranks are provided in slab rebar at supports, based upon negative bending moment occurring distance the cranks provided. Short notes:-To counter the negative bending moment in the R.C.C Slab Cranks are provided.   Article By Pandi Rajendran B.E

BRICKWORK CALCULATION

  BRICKWORK CALCULATION   Let calculate the brickwork for image 2 Image 2 Step 1:- Calculate for the wall of size Length, Breadth and Depth                       V=LxBxD                 =3x0.19x3                            =1.71 cu.m Step 2:- Calculate the volume of one brick                  Note:- add 10mm(0.01m)  for each side of brick for cement mortar thickness (eg:- Modular brick size is 190mmx90mmx90mm while finding brickwork volume should to be taken as 200mmx100mmx100mm ).                            ...